Petropolitik, Sapian and China 13th and Final Part
Wednesday, May 24th, 2006Table of contents for Petropolitik, Sapian And China
- Petropolitik, Sapian And China 1
- Petropolitik, Sapian and China 2
- Petropolitik, Sapian and China 3
- Petropolitik, Sapian and China 4
- Petropolitik, Sapian and China 5
- Petropolitik, Sapian and China 6
- Petropolitik, Sapian and China 7
- Petropolitik, Sapian and China 8
- Petropolitik, Sapian and China 9
- Petropolitik, Sapian and China 10
- Petropolitik, Sapian and China 11
- Petropolitik, Sapian and China 12
- Petropolitik, Sapian and China 13th and Final Part
Petropolitik, Sapian and China - Thirteenth and Final Part
Phew! Final part. Sapian is part of the Visayas Grid, powered by the combined generation capacities of Tongonan, Kanlaon and Palinpinon geothermal plants. On its own, the Capiz Electric Cooperative (CAPELCO) is solely dependent on bunker fuel. Other power plants in the region are predominantly bunker fuel, fuel oil and coal-fired. National Power Corporation (NAPOCOR) augments shortages around the Visayas islands with bunker fuel-run power plant barge. Bunker fuel is generally used to run factories, and Chinese power plants and factories consume increasing volumes of that fuel distillate. Recently, China has been consuming nearly half a million barrels of bunker fuel everyday, and more than three times more fuel oil. See China’s Petroleum Consumption, by Economic Sector, 2002
As such, CAPELCO competes against China for scarcer bunker fuel. Increased demand for electricity in Sapian was due to expanded electrification. But power is essential to spur growth and development. With electric power, people would enjoy improved quality of life and have access to better opportunities. Families would converge around energized areas to enjoy the amenities of modern technology, like the wider world-view TV offers, and food-preserving refrigerators, and better study hours for students. They could operate capital equipment like rice mills and welding machines, and would have a longer productive day. Senator Juan Flavier once joked in a meeting that electrification also reduces birth rate because people could follow soap operas instead of going to bed early. In short, electric power also empowers people in many ways.
Over 15 years after Poblacion was energized, a large chunk of Sapian, from Crossing Bilao onward to Lonoy and Guibongan did not have electric power. I recall Igsoons Toti and Bodong having to come to Poblacion to charge car batteries to power their TV. I do not know if they are served today, but in any event, a lot of households should be served by now. Energizing that part of Sapian can be traced to Cory Aquino’s visit to Iloilo.
Cory’s regional visits and inspection trips have been the domain of former Cabinet Secretary Jose P. de Jesus (later, DPWH Secretary). But it was turned over to Chito Sobrepena when Malacanang was reorganized under the flamboyant Executive Secretary Oscar Orbos. Government programs and projects are usually developed through long bureaucratic processes, but Cory also wanted to go directly to the people to know about their needs and to address local problems. Secretary de Jesus was designated to coordinate during the early part of the Aquino Administration. At the latter half, Sobreprena was appointed under the Office of Special Concerns. I was part of Sobreprena’s core-group for regional visits. That unit coordinated all presidential visits across OP and line departments. During visits, we collected hundreds of letters and resolutions from local governments and individuals. We make sure that visits run smoothly. One time, I earned the ire of the Bishop of Nueva Caceres in Naga City when I asked what would he say in his prayers at a program the next day. He snapped, “It’s between me and God!” Advance party had to be quizzical because one priest prayed to God to fix a bridge in a program. Cory was put on the spot and could not respond right away.
Cory’s visit to Iloilo was announced to the media far ahead in advance. But in case they did not hear about it in Sapian, I told the late Uncle Alber Gallardo, Sr., former ABC President. When I called him at Movietone Studio, he said he heard about the visit and had been planning to write a request letter. At that time, he said he was torn between a farm-to-market road in Poblacion and electrification from Bilao to Guibongan. Two weeks later, when we collected his letter during Cory’s dialogue with the local officials in Iloilo, his letter requested Cory for a power connection to Bilao-Lonoy-Guibongan. As a closing statement in that dialogue, Cory promised her very special commitment to all the requests submitted, verbal and written. Hence, in compliance to the President, all letters gathered and oral requests raised at that specific event bore a collatilla, “the President’s very special commitment.”
When request letters have been sorted in Malacanang, Uncle Alber’s request was grouped together with a similar request for Dacoton, Dumarao. Office of the President’s Office Special Concerns Director Nick Torres promptly conveyed this very special commitment of the President in a memorandum to the National Electrification Administration (NEA). NEA, soon thereafter, had informed CAPELCO that a special loan with Land Bank of the Philippines was being offered under the rural electrification program. CAPELCO initially expressed disinterest, stating that the proposed connection would be fiscally infeasible given the density of prospective users and the long stretch of power lines that would be required. Director Torres again issued a memorandum reminding NEA that the very special commitment of the President had to be delivered to the people of Sapian. NEA replied two weeks later that a barge carrying electric posts from Leyte are en route to Roxas City. Uncle Alber Gallardo, as the requestor, and Uncle Nicoy Odrunia, as a Sapian delegate to CAPELCO Board of Directors, have been continuously apprised of the status, as are any requestor for President’s assistance from anywhere else. As FVR said, fire on top and fire at the bottom get things done.
Uncle Alber had been very happy about the completed electrification project. I also heard about the ceremonial switching. I remembered about this project recently when Nang Luz Obligar talked about a power outage during their visit to a church in Lonoy that her daughter, Inday Reynalda Firmalino, helped build. Hopefully, the project had been financially feasible for CAPELCO as it is empowering for the Sapianons it now served.